Aave
Nov 11, 2026

Aave Founder Calls for Circuit Breakers in DeFi Lending Protocols

Aave founder Stani Kulechov said DeFi lending protocols need circuit-breaker mechanisms because the effects of oracle failures can take years to remove. He cited two incidents involving large losses and sudden movements of funds. A configuration error on March 10, UTC, led to about $27 million in liquidations, according to his example. In April, UTC, the LayerZero bridge used by KelpDAO was hacked for $292 million, after which Aave recorded $8.45 billion in deposit outflows within 48 hours. Aave is now advancing V4, which can freeze specific collateral assets. Kulechov also said deposits in Aave’s lending markets exceed $30 billion. He added that a DAO had previously required about $300 million in rescue funding. Techub News reported the remarks, citing Crypto Briefing. The comments were made in London on November 11, 2026.

20
Aave Founder Calls for Circuit Breakers in DeFi Lending Protocols
ApeChain
Nov 4, 2026

ApeChain plans to move from LayerZero to Chainlink CCIP

ApeChain is planning to switch its cross-chain setup from LayerZero to Chainlink’s Cross-Chain Interoperability Protocol, or CCIP. The plan also calls for APE and USDC to be upgraded into Chainlink Cross-Chain Tokens, according to details cited by The Defiant. What has not been laid out yet is just as notable: the announcements do not explain what token holders will need to do during the migration, and they do not give a shutdown date for the legacy bridge. That leaves two operational questions unresolved as the transition plan takes shape. The report was published by The Defiant on Nov. 4, 2026.

1860
ApeChain plans to move from LayerZero to Chainlink CCIP
21X AG
Nov 4, 2026

21X AG and LayerZero complete institutional onchain trading pilot

21X AG and LayerZero have completed an institutional onchain trading pilot, according to Techub News, citing PR Newswire. The test ran 21X AG’s real-time central limit order book on Zero, a private permissioned instance, and reported performance gains of up to 45x. The setup also operated without offchain matching, a detail highlighted in the announcement. The release identified 21X AG as Europe’s first fully regulated DLT trading and settlement venue. The pilot centers on bringing an institutional-grade trading workflow onchain while keeping the order book running in real time inside the tested environment. No additional financial terms or rollout timeline were disclosed in the brief. The update was published by Techub News under its policy and regulation category. PR Newswire was cited as the source for the announcement.

740
21X AG and LayerZero complete institutional onchain trading pilot
Circle
Nov 3, 2026

Circle opens CCTP to third-party tokens, sharpening competition over cross-chain token standards

Circle has opened its Cross-Chain Transfer Protocol, or CCTP, to all token issuers, extending a system that had largely been used for USDC into a broader cross-chain token rail. CEO Jeremy Allaire said on Nov. 2 that the move was a "major unlock" for asset issuers, following a developer guide published on Oct. 30 for ERC-20 integrations. DefiLlama data cited in the report shows CCTP handled $182.05 billion in cumulative volume from January 2024 through Nov. 2, 2026, with $17.61 billion over the past 30 days as of Nov. 3, the highest among tracked bridges. The opening does not change CCTP’s core trust model. Cross-chain attestations are still produced by Iris, the signing service operated by Circle. That leaves issuers weighing distribution against control: CCTP offers access to the largest bridge flow in the market, but it also requires non-USDC projects to rely on Circle for verification. Competing standards such as LayerZero’s OFT, Wormhole’s NTT and Chainlink’s CCT under CCIP use different validator setups, and many large issuers have already deployed there. The report argues that, given validator centralization and limited non-USDC chain coverage, CCTP may not yet offer a strong enough reason for established issuers to switch.

1550
Circle opens CCTP to third-party tokens, sharpening competition over cross-chain token standards
Initia
Nov 2, 2026

Initia L1 and Rollups Back Online, Bridge Transfers Expected Later Today

Initia said its Layer 1 network and Rollups are back online and operating normally, with bridge and trading platform transfer functions expected to resume later today. The update also outlined temporary withdrawal controls for selected assets. Withdrawals for LayerZero Omnichain Fungible Token, or OFT, assets WETH and AUSD0 will be processed with a 24-hour delay as a precaution. Noble USDC withdrawals will be subject to an hourly cap. Initia added that asset backing for AUSD0, USDC.n, and WETH has been fully restored. The notice was cited by ChainCatcher in a 7x24 news update.

1500
Initia L1 and Rollups Back Online, Bridge Transfers Expected Later Today
Initia
Oct 30, 2026

Initia targets Nov. 2 restart for L1 and rollups, says transaction history will stay intact

Initia said its Layer 1 network and rollups are scheduled to resume operations on Nov. 2 after a chain upgrade that will deploy an independently audited MoveVM patch. The team said the upgrade will isolate the attacker’s remaining forged balances, add extra security measures, and leave transaction history untouched, with no rollback planned. Before the restart, backing assets for AUSD0, USDC.n, and WETH will be fully restored, and users do not need to take any action, according to the project. Initia also said its DEX will briefly pause after coming back online so a designated account can rebalance pool prices to market levels. Any gains generated during that rebalancing process will be returned to affected liquidity providers. Transfers through bridges and exchanges will resume only after the network has been monitored for a period of time. Withdrawals for LayerZero OFT versions of WETH and AUSD0 will be set to 24 hours. Foresight News had previously reported that Initia was attacked on Oct. 23, when an attacker exploited a MoveVM script cache vulnerability to forge balances and move roughly $2.7 million in assets.

1660
Initia targets Nov. 2 restart for L1 and rollups, says transaction history will stay intact
Initia
Oct 27, 2026

Initia says MoveVM fix is under audit after four-day shutdown, network restart planned in coming days

Initia has outlined its next steps after a MoveVM zero-day exploit forced the modular blockchain to halt its network on Oct. 23. In an update released on Oct. 27, the team said it has completed a security fix and sent the patch for external review. Once the audit is cleared, Initia plans to publish a recovery plan for affected assets and restart both its Layer 1 chain and Interwoven Rollup network in stages. The incident centered on a flaw in Initia’s customized MoveVM module built on Cosmos SDK. According to the project’s account, the attacker used the bug to forge unauthorized state changes and mint 2 million unbacked Agora AUSD stablecoins. The attacker then moved roughly $2.6 million to $2.7 million worth of AUSD, ETH and USDC through LayerZero bridge infrastructure and other liquidity adapters to Ethereum. Validators triggered an emergency circuit breaker at 15:41 UTC on Oct. 23, freezing the L1 chain and connected Minitias. Initia said its native INIT token was not affected. It also said Agora froze related addresses on Ethereum, while Upbit, Bithumb and Kraken imposed temporary controls on relevant deposit and withdrawal channels. The team now says the patch has been written, the vulnerable attack surface has been removed, and a fuller recovery document will follow after the audit is complete.

1780
Initia says MoveVM fix is under audit after four-day shutdown, network restart planned in coming days
Total 182 items
Go topage