NVIDIA
Aug 14, 2026

NVIDIA’s Feynman platform is said to target TSMC A16 and large-scale CPO deployment in 2028

NVIDIA has already moved into development and supply-chain planning for Feynman, the AI accelerator platform expected to follow Rubin, according to a Digitimes report cited by ABMedia. The report says Feynman is set to use TSMC’s upgraded A16 process, pair it with custom HBM, and adopt both SoIC 3D stacking and co-packaged optics, or CPO, at scale, with volume production targeted for the second half of 2028. What makes the platform notable is the simultaneous push across three technical layers: process technology, advanced packaging, and optical interconnect. Supply-chain data cited in the report shows NVLink bandwidth rising from about 130 TB/s in Blackwell NVL72 racks to 260 TB/s in Rubin, 520 TB/s in Rubin Ultra, and more than 1,000 TB/s in Feynman. At that level, copper links are approaching practical limits in distance, power, signal loss, and thermal management, making optical interconnect a more direct fit for large AI clusters. The same report says TSMC is expanding advanced packaging capacity from AP5 and AP6 into AP7 and AP8, while repeatedly lifting SoIC monthly capacity targets from 20,000 wafers by the end of 2026 to 50,000 by the end of 2027. It also places Feynman inside NVIDIA’s wider capital and supply strategy, including more than $40 billion invested across the AI ecosystem since 2026 and a financing platform with Apollo, BlackRock, Blackstone, and Goldman Sachs aimed at mobilizing $500 billion in third-party capital.

4480
NVIDIA’s Feynman platform is said to target TSMC A16 and large-scale CPO deployment in 2028
TSMC
Aug 12, 2026

TSMC says 5.5x reticle CoWoS is in mass production, flags ABF substrates as next constraint

Taiwan Semiconductor Manufacturing Co. said its 5.5x reticle-size CoWoS packaging has entered mass production, with yields holding above 98% and some products topping 99%, according to comments made publicly on Aug. 11 by Vice President of Advanced Packaging Ho Chyun. He said the company aims to scale CoWoS to 14x reticle size by 2029, while also pushing SoIC hybrid bonding from a 6-micron pitch already in production to 4.5 microns by the same year. Ho said TSMC’s CoWoS capacity has nearly doubled every year over the past three years and that the company now operates 10 advanced packaging fabs globally. Supply is now much closer to customer demand, he said, though it still has not fully caught up. He also pointed to a new supply-chain strain for AI hardware. After memory, ABF substrates are likely to become the next major bottleneck, he said. In his view, multisourcing does not fully solve the problem because substrate differences across suppliers can complicate coplanarity control and hurt yields during system integration. Ho also called for broader industry coordination through the Open Compute Project to build system-level validation standards and speed AI product development and ramp-up.

2880
TSMC says 5.5x reticle CoWoS is in mass production, flags ABF substrates as next constraint