Base
Jun 28, 2026

Base Mainnet Suffers Two Block Production Outages in Two Days: Sequencer State Management Bug Identified, User Assets Safe

Base mainnet experienced two block production interruptions on June 25 and 26, lasting 116 minutes and 20 minutes respectively. The root cause was identified as a sequencer state management bug: after a failed transaction execution, the system failed to clean up historical journal state, causing incorrect gas calculations for subsequent valid transactions, which produced invalid state transition blocks and halted the L2 network. Base deployed a patch (PR #3806) to fix the core issue and plans to enhance protocol-level fuzz testing and stress testing, upgrade monitoring systems, and introduce a graceful recovery mechanism to improve future resilience. User assets remained secure throughout the incidents.

1370
Base Mainnet Suffers Two Block Production Outages in Two Days: Sequencer State Management Bug Identified, User Assets Safe
Base
Jun 27, 2026

Base Post-Mortem: Sequencer Block Building Logic Bug Caused Two Outages, User Funds Safe

On June 25–26, the Base mainnet experienced two consecutive block production outages totaling over 136 minutes. Base’s engineering team published a post-mortem report identifying the root cause as a vulnerability in the sequencer’s block building logic that failed to clear stale log state after an invalid transaction validation, leading to gas accounting mismatches and invalid blocks that halted the chain. No chain integrity or user funds were affected. A patch has been deployed, and Base will enhance protocol fuzz testing and load testing to prevent recurrence.

990
Base Post-Mortem: Sequencer Block Building Logic Bug Caused Two Outages, User Funds Safe
Total 26 items
Go topage