YOM has confirmed that its Token Generation Event and mainnet launch will take place on March 25, 2026. The date marks the start of the project’s on-chain economy. Based on the details released so far, YOM is building decentralized cloud gaming infrastructure designed for game streaming, white-label platforms, and large-scale digital entertainment delivery.
TGE date is fixed, while listing details remain undisclosed
The launch date was shared through an official update on X. What has not been disclosed is the exact listing time or any confirmed exchange venues. The project’s partnership with OKX Wallet has drawn attention as a possible signal for future listing direction, but no exchange confirmation was included in the source material.
According to the project, the YOM token is meant to reward node operators, support network expansion, and serve governance and incentive functions. As more games connect to the network, the token is intended to link developers, players, and operators within one decentralized system.
750 million supply on Avalanche with treasury and ecosystem leading allocation
YOM’s published tokenomics set total supply at 750,000,000 tokens on Avalanche (C-Chain / YOM L1). The largest allocation goes to the treasury at 37.50%, followed by the ecosystem at 25.00%, HODL at 17.31%, and the liquidity pool at 10.21%.
The remaining shares are split across private allocation at 3.00%, team at 3.00%, community at 2.78%, exchanges at 0.80%, and quests at 0.40%. The structure places a large portion of supply into treasury and ecosystem buckets rather than immediate market circulation.
Initial valuation set at $0.100, roadmap includes DAO and NFT migration
The team has set YOM’s initial valuation at $0.100. The source also notes that market analysts see a possible move toward the $1 to $2 range if major exchange support arrives after launch. That view is presented as conditional and tied to adoption and liquidity, not as a confirmed outcome.
After launch, YOM’s roadmap includes per-session reward distribution, automated vesting systems, NFT migration to Avalanche, and the start of DAO governance. The March 25 rollout is positioned as more than a token release, tying the asset launch directly to the project’s network going live.

