JNTC says it cut 2mm glass substrate copper filling time to minutes as Broadcom speculation grows
South Korean glass substrate maker JNTC says it has reduced copper via filling time on a 510×515mm, 2mm-thick TGV glass substrate from half a day or more to the level of minutes, according to a report by Korean media outlet THE ELEC on Oct. 6. The company has reportedly passed validation by a U.S. semiconductor customer and plans to begin mass production of Glass Core substrates in 2027, with industry speculation pointing to Broadcom as a possible customer. JNTC said demand for substrates thicker than 2mm is rising as AI chips grow larger and package sizes expand, increasing the risk of warpage and cracking due to differences in thermal expansion coefficients among glass, copper, and insulating materials. The company said it addressed the bottleneck with an hourglass-shaped via design and a proprietary metallization process, though it did not disclose detailed process information, yield, cost, or the exact duration behind its “minutes-level” claim. The company currently operates one pilot line in Hwaseong with monthly capacity of about 10,000 to 12,000 units, and plans to invest KRW 347 billion in a new plant in Gimcheon. JNTC also said it has signed NDAs with 27 companies, while seven customers have moved from free samples to paid samples.








